The OF tutorials show being able to set up a project to repeat every X amount of time with an option between assigned date or completed date. In either OF 1.75 or 1.8 sneaky peek the option between those two things doesn't show up in my inspector. Neither does it show up in my iPhone. This makes a big difference to me and how I use repeating actions, how do I set this explicitly?

Greg Jones
2010-07-06, 08:03 AM
It's there, although the tutorial may show an older version of the Inspector. On the Mac:

http://grab.by/grabs/a8215114e04f0b795188bbd3d5c73fd1.png

On the iPhone:

http://grab.by/grabs/b710b3603a8e127548d1e1d27980f581.png

Select 'Due After' instead of 'Start After' if you want to assign a due date.

SteveMack
2010-07-06, 08:16 AM
Ohhh, I see, I was always just saying "repeat every X", and not "start after" / "due after". Thanks a lot, that was very annoying, haha. Yeah, the tutorials seem to be a tiny bit outdated.