View Full Version : Due dates...
Tinchohs
2007-12-08, 08:46 PM
Something has change in the later build of the application, that I now loose the 'due date' column from my views every-time I come back from a perspective.
Needless to say, this is quite annoying and time consuming. Am I missing something? I don't recall this happening before.
Thanks a lot. Martin.
VicDiesel
2007-12-08, 09:09 PM
Something has change in the later build of the application, that I now loose the 'due date' column from my views every-time I come back from a perspective.
View > Columns > Due Date.
Then click the camera on the perspectives window to make sure it is remembered.
It's a bug, yes.
Victor.
Tinchohs
2008-01-03, 06:47 PM
Something has change in the later build of the application, that I now loose the 'due date' column from my views every-time I come back from a perspective.
Needless to say, this is quite annoying and time consuming. Am I missing something? I don't recall this happening before.
Thanks a lot. Martin.
I now this circulated for a while, but it still seems to be an issue with me. If I am in a perspective view and them either switch a task from context to planning mode, or go the the library by pressing cmd+1, I automatically loose the due date and start date columns.
Has there been as work around for this? It is very annoying when moving around to always have to add this to the view.
I know I can save the view into a perspective, but that does not do it. because the moment I switch of navigate the app I loose the columns any way.
Thanks.
matt2
2008-01-04, 07:13 AM
I'm having the same "switch" issue and we're discussing over in http://forums.omnigroup.com/showthread.php?t=6490