View Full Version : New Action Items at the top?
bsippel
2008-05-07, 10:48 AM
I was wondering if there was a way to have new Action Items appear at the top of a project action list as opposed to at the bottom? It might be something I've missed in the options but I would like to see the most recently added action at the top as opposed to the bottom.
Thanks,
- Bryan
Toadling
2008-05-07, 12:03 PM
Do you mean they appear at the bottom when you drag an action onto a project in the sidebar (e.g. dragging new actions from your Inbox to a project)?
If that's the case, then no, I don't think there's a way to control the new action's position. It always appears at the bottom of the list.
On the other hand, if you're in a project and want to add a new action to the top of the list, you can select the current top-most action and hit Shift-Return to create a new action above the existing one.
You can also select a list of actions (or hit Command-A to select all in the current projects) and choose Edit -> Sort -> By Date Added to sort the items by creation date (in descending order with most recent additions on the top).
Hope this helps.
bsippel
2008-05-07, 04:33 PM
Hey Toadling
Perfect, both Shift-Return and the Edit-->Sort-->By Date Added were exactly what I was looking for. Thanks!
- bsippel
vBulletin® v3.7.2, Copyright ©2000-2008, Jelsoft Enterprises Ltd.