Following up on items with Context = Waiting
Hello all,
Is there a way for me to create a conditional task item? For example, in the Project "Fix Car" there are two tasks: Fix Car - Repair Shop: Provide estimate (WAITING) - Authorize car repairs (PHONE) In the event that the repair shop takes too long in responding, I'd like the next step to automatically change: Fix Car - Call repair shop and ask them to hurry their estimate (PHONE) - Repair Shop: Provide estimate (WAITING) - Authorize car repairs (PHONE) Here's the hiccup: If the Repair Shop gets back to me immediately, I never want to see the step regarding pestering the repair shop. Does this make sense? Is it possible? Thanks, Cav |
1 Attachment(s)
Not exactly. What you could is set up a parallel action group containing both the desired action and the one that has you prod the repair shop, with a start date sometime in the future for the latter. If you don't hear from them, eventually you start seeing the action to call them. If you do hear from them, you just delete the unneeded future action.
|
All times are GMT -8. The time now is 04:27 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.