The Omni Group Forums

The Omni Group Forums (http://forums.omnigroup.com/index.php)
-   OmniPlan General (http://forums.omnigroup.com/forumdisplay.php?f=37)
-   -   How to accommodate piece rates and batch sizes? (http://forums.omnigroup.com/showthread.php?t=17521)

LolliDoo 2010-08-23 09:07 AM

How to accommodate piece rates and batch sizes?
 
I'm using OmniPlan to schedule production runs in our manufacturing facility.

We use all contract labor who are paid a piece rate per each individual task within the production schedule.

I'm curious if it's at all possible to set time and cost parameters for each task, and then tell OmniPlan the batch size to have it automatically calculate the time and cost parameters for each task (and overall project) for the entire batch?

Thank you.


All times are GMT -8. The time now is 07:08 AM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.