Multiple tasks per line
Most of the projects with which I'm involved have numerous milestones which need to be included in the project schedule. However, each milestone takes up an entire line in OmniPlan which makes the size of the Gantt chart for even small projects completely unwieldy (there's a ridiculous amount of unnecessary white space). Is it possible to have multiple entries per line in the Gantt chart?
|
All times are GMT -8. The time now is 04:20 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.