Feature request - default insert location for new tasks
I have a "what next" perspective with the following settiongs:
View Mode: Context Focus: No Focus Filter: Remaining Grouping: Context Sorting: Project Action Filter: [B]Next Action[/B] Time Filter: Any Duration Flag Filter: Any Flag State I use this as the proxy for my daily "todo" list; I work things based on my mental state, current location, and available time off this list. However, when I add things to projects via inbox, quick entry, or clipping, they are added to the [I]bottom[/I] of the project list. This is almost always the wrong order; the things that occur to me on the fly are usually short, urgent action items which I need to take care of in a different context. As such, I want new items to appear at the *top* of the project list. If they need to be moved somewhere else on the list, they'll pop up as I work through the next actions, which makes the next action to put them in the right place on the list. I suspect many people don't work this way, so this would probably need to be an option, but I'd really like it -- I keep having to remember to go through and move things to the top of my projects, both a waste of time and worse, easy to forget (avoiding which is the [I]point[/I] of all this). Would this be useful to anybody else? |
All times are GMT -8. The time now is 01:38 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.