Tasks with assigned Context, but no Project assigned to Inbox
I find that newly-created Tasks/Actions with assigned Context, but no Project are assigned to Inbox. I want these Actions to not be placed into Inbox.
I recall some place to programmatically control this "by default place into Inbox behavior," but now I can't find it. If such a thing exists, can someone point me to it? (and thx) |
I think you're looking for this preference:
[IMG]https://dl.dropboxusercontent.com/u/1747618/Forums/cleanUpWithContext.png[/IMG] |
All times are GMT -8. The time now is 05:04 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.