Why does Inspector review date revert?
Why, after setting the inspector review date to the desired future date does it revert back to the original date.
I noticed this after reopening it. I reopened it because I wondered why the project did not disappear from the heading "Review within the last month". |
[QUOTE=Flexattend;64007]Why, after setting the inspector review date to the desired future date does it revert back to the original date.
I noticed this after reopening it. I reopened it because I wondered why the project did not disappear from the heading "Review within the last month".[/QUOTE] Well, you see, the reason it does is because it is a bug. |
I seem unable to reproduce this issue. Can you post the recipe?
-Dennis |
All times are GMT -8. The time now is 02:25 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.