The Omni Group Forums

The Omni Group Forums (http://forums.omnigroup.com/index.php)
-   OmniFocus for iPhone (http://forums.omnigroup.com/forumdisplay.php?f=49)
-   -   Bug with Project due date (http://forums.omnigroup.com/showthread.php?t=10359)

mattido 2008-10-30 07:23 AM

Bug with Project due date
 
I set a due date for a Project, but now I want to remove the due date. A bug seems to be not allowing me to remove it. I set it to none, but the change is is not saved.

I'm using 1.0.3 (08-08-2008 build).

whpalmer4 2008-10-30 08:43 AM

[QUOTE=mattido;49719]I set a due date for a Project, but now I want to remove the due date. A bug seems to be not allowing me to remove it. I set it to none, but the change is is not saved.

I'm using 1.0.3 (08-08-2008 build).[/QUOTE]
Are you saving the change? If you press <return> after making the change, it should stick, assuming you are changing it by typing in the due date column or the inspector. I think we would have heard about it by now from lots of people if this just didn't work at all :)

Lizard 2008-10-30 04:22 PM

Uh, those instructions would work on the desktop. (No worries, I made the same mistake a couple days ago.)

On the iPhone, the essential step is to tap the Save button in the upper right corner after clearing the project start date.
(I don't have 1.0.3 handy to test, so if that doesn't work for you, please rest assured that it has been fixed in 1.1.)

whpalmer4 2008-10-31 02:14 AM

[QUOTE=Lizard;49756]Uh, those instructions would work on the desktop. (No worries, I made the same mistake a couple days ago.)
[/QUOTE]
Sigh. Not the first time for me, either. Well, I stand by my statement that if it just didn't work, we'd have heard about it from lots of people by now :)


All times are GMT -8. The time now is 05:08 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.