The Omni Group Forums

The Omni Group Forums (http://forums.omnigroup.com/index.php)
-   OmniPlan General (http://forums.omnigroup.com/forumdisplay.php?f=37)
-   -   Attaching assets to tasks/groups (http://forums.omnigroup.com/showthread.php?t=26281)

bagleya1 2012-10-16 09:32 AM

Attaching assets to tasks/groups
 
I'm new to MAC and OmniPlan. I have built a lengthy project plan an attached the relevant assets where needed to tasks, groups, milestones etc. The larger this plan gets the slower it is to load.

At this point, I am only getting a color wheel while waiting for the plan to load. At this point I cannot add, change or attach anything. Is there a certain storage cap for each doc?

whpalmer4 2012-10-17 08:38 AM

One would naturally assume that a large plan might take longer to load than a small plan, I think. On the other hand, attached documents shouldn't need to be loaded until they are accessed, so their presence shouldn't affect loading time as much as the same number of bytes spent encoding tasks. Hard to say anything much more concrete without specifics. You should contact Omni support directly and have them take a look with you. 1-800-315-6664 or +1-206-523-4152, 10-5 weekdays Seattle time. You could also use the Help->Send Feedback command to send a copy of your document to them for evaluation — it will convert the text in the copy of your document to gibberish, but I don't think it does anything with attached documents, so proceed accordingly.

bagleya1 2012-10-17 08:47 AM

Thank you. Called yesterday. Very helpful. It's worth noting that one of my end dates had a time constraint of 1913 rather than 2013 (which you can't see in the doc itself, only in the inspector). This is what caused the slow down. I should have known it was my error.


All times are GMT -8. The time now is 10:28 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.