Task Groups Assigned label not being displayed
1 Attachment(s)
In the View Options dialog the right hand label of the Task Groups is set to 'Assigned' and yet the Gantt chart does not display a summary of the assigned, irrespective of whether the group is expanded or not. This was the default setting so I imagined this would be supported. I would at least expect the assigned to be displayed on a collapsed group. Is there something I've missed?
thx |