steve 2007-09-19 09:28 PM

The Power of 2 minutes
 
Here is a little trick that I used tonight that might be helpful. While reviewing my project list, I realized that many projects had 2 minute NA's holding up progress. OF is brilliant and I continue to find new features. I command+clicked on all of my 2 minute actions and then changed the estimated hours field in the action inspector. Then I created a perspective that showed NA's with a duration of less than 5 minutes. It was fabulous to rip through 20 NA's. I'm going to make this a part of my weekly review.

ext555 2007-09-20 03:29 AM

that is a really cool tip ! thanks for sharing that .. I'm adding it to daily review [when possible ] right alongside " verify next actions exist " : )

santra 2007-09-30 08:57 AM

This is a fabulous tip.

But what are NAs? And how do I set durations?

I'd really like to implement this, so that I can set easy tasks to 5 mins and then set up a Perspective for 5 mins. and under.

--Sandy Santra

dhm2006 2007-09-30 09:10 AM

[QUOTE=santra;21928]But what are NAs?[/QUOTE]

Next actions.

[QUOTE=santra;21928]And how do I set durations?[/QUOTE]

Go to Preferences and select the extra column "Extimated Hours."

santra 2007-09-30 09:28 AM

OK, cool. So with Library selected on the left, and the View set to Duration 5 mins., on the right I see only those tasks that are that length or under. Unfortunately, I also see all the other projects (but with no tasks listed). Any way to hide them and just show a list of the projects with tasks 5 mins. and under (and the tasks, of course)? Some of these (maybe all) are empty projects, so maybe what I need is some way not to show empty projects in a view. Thanks.

dhm2006 2007-09-30 10:17 AM

[QUOTE=santra;21931]OK, cool. So with Library selected on the left, and the View set to Duration 5 mins., on the right I see only those tasks that are that length or under. Unfortunately, I also see all the other projects (but with no tasks listed). Any way to hide them and just show a list of the projects with tasks 5 mins. and under (and the tasks, of course)? Some of these (maybe all) are empty projects, so maybe what I need is some way not to show empty projects in a view. Thanks.[/QUOTE]

Not in Planning Mode.

Try it in Context Mode.

santra 2007-09-30 12:37 PM

That's it. Thanks!