The Omni Group Forums

The Omni Group Forums (http://forums.omnigroup.com/index.php)
-   OmniFocus 1 for Mac (http://forums.omnigroup.com/forumdisplay.php?f=38)
-   -   GTD concepts in OF terms (http://forums.omnigroup.com/showthread.php?t=6935)

jpkunst 2008-01-26 12:11 AM

GTD concepts in OF terms
 
[URL="http://forums.omnigroup.com/member.php?u=7"]wvh[/URL] from Omni wrote, in [URL="http://forums.omnigroup.com/showthread.php?t=6329&page=5"]this thread[/URL]:

[QUOTE]the "Blocks Next Action" setting in the Context inspector is supposed to be our native support for Waiting contexts, and the "On Hold" status for projects is supposed to be our native support for Someday/Maybe lists. Perhaps we need to point these out in a better way so that people realize what the "best practice" is for implementing GTD concepts.[/QUOTE]

I would like to say that I would appreciate that very much. I read David Allen's book and it is not always obvious to me how key GTD concepts translate to OF. There are of course multiple ways possible of implementing those, but, speaking for myself, I would first try the way that the OF designers had in mind, and only if that would not suffice would I try to improve on it.

As an example, until I read your post, I marked 'waiting for' actions with the Flag. Sure, it worked, but until I read your post I did not realize that the way I was supposed to do that is with a 'Waiting' context which is marked 'On Hold' (I couldn't find a [I]Blocks Next Action[/I] setting in the Context inspector, but I suppose you were talking about a pre-release OF version; I assume this is now done by setting the Context on hold). And this way works better because 'waiting for' actions stay out of sight unless I focus on them.

So, to summarize: a list of key GTD concepts with suggested OF ways to implement them would be very welcome.

Best wishes,
Jan Pieter Kunst

pjb 2008-01-26 06:11 PM

The "blocks next action" feature no longer seems to be present, or at least I can't find it. The Sync preference refers to blocked actions but I'm not sure how that relates.

Frosty Crunch 2008-01-26 07:33 PM

Perhaps he meant to make a project sequential, such that the action would block the other remaining actions?

Craig 2008-01-26 07:41 PM

I think putting contexts "on hold" has replaced the context option mentioned in the quoted thread.

jpkunst 2008-01-27 08:45 AM

[QUOTE=Craig;31963]I think putting contexts "on hold" has replaced the context option mentioned in the quoted thread.[/QUOTE]

That was my impression as well.

Kosjer D 2008-01-27 11:30 AM

i like the idea of gtd concepts in of terms
 
wouldn't it be an idea if the omnigroup starts a video podcast to point out the way they had in mind using Omnifocus in a GTD context. Guess the userbase would benefit extremely and take usage of the whole possibilities provided by omnifocus. my two cents ;) k:d


All times are GMT -8. The time now is 05:17 AM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.