View Single Post
I am trying to use GraphSketcher for a sprint burndown chart. I set up the graph, but every day I need to enter new data and extend the existing lines. Is there a supported way of doing this?

Currently I am having to go through these steps for each line:
- Draw new point
- Add existing line to selection, group
- Change line type to None to remove existing line
- Re-select line type to plot line with the new point
- Re-select color, line thickness, and point shape to match existing style

Not sure if I've missed something in the Help, but I would like to be able to:
- With current line selected, draw new point
- Have line automatically extended to new point with a matching style