View Single Post
Quote:
Originally Posted by Shotster View Post
In the repeat inspector, there's the option to repeat from the "assigned date". What exactly is the assigned date? In the date inspector, you can apparently assign a start, due, and complete date. To which one of these assigned dates is the repeat inspector referring?
I'm starting to think that this is a UI inconsistency. Perhaps "assigned date" in the repeat inspector actually means "due date"?