hi everybody,

there are no/wrong calendars- and task-files (as ics-files) in the directory, if i export a project as a html-full-export.

details:

i have build up a project with several tasks. inside this project, there are 5 teams. each team is responsible for one or more tasks.

for that a have created 5 "stocks/materials", inside 2 groups:



after that, i have assigned every task to a stock. now, its possible that every group can have a look to their tasks and responsibility.

know if i export the project, there are no calendars in the special directory "calendars" for exactly this stocks. but the links are inside the report for the calendars. and if i click one of this link, i get the message "fault: file not found".

what do i make wrong?

regards hans