View Single Post
Hi there, I am trying out the trial version, and I was wondering if there was a way to assign the times to a group as opposed to the individual tasks within the group. I find that sometimes certain groups of tasks are many smaller tasks, and there is no need to enter 10 minute intervals, etc.

I like to get quite verbose in detail at times with sub tasks, etc.

Thank you.