View Single Post
Quote:
Originally Posted by whpalmer4 View Post
What do you have for settings for "Clean Up Inbox items which have" in the Data preferences? I use "Both a project and a context" and things stay exactly where I leave them until fully specified.
I have the same setting. It's not an inbox issue, it's a context view issue. Sorry if I wasn't clear. I don't want items entered in context view to default to Miscellaneous (or whatever is set), I want them to go to the Inbox if no project is entered. Even better would be to have them assume the project immediately above, or at least to not jump around due to premature sorting while still entering. For some settings, e.g. group by project and sort by context, no premature sort, but for others, such as context and context there is. This does suggest the behavior is an unintended misfeature, if not a bug.

Last edited by mcogilvie; 2010-11-15 at 09:24 AM..