View Single Post
Quote:
Originally Posted by Nevir
Seems to me like this should be something that's placed in the inspector, and not an icon on the parent task (how often would one use the feature?) - the user could infer the type via italics, or normal, on the non-active tasks. I would think that arrows along-side each parent task might be a bit too cluttering/grab more attention than necessary. (or maybe, if they are to be used, in a softer shade)
I would use this feature all the time. I quite often have subtasks that are parallel within a project that is sequential. Though I concur with displaying such information in muted tones.