View Single Post
Hi, I currently have OF1.6(v77.16.3.0.110061) on my Mac OS 10.5.6. I seemed to have a format problem with each of my task showing completed even though it was not. The main task text was crossed out though its sub-tasks were not. So I tried to use filter to check if the task was indeed completed or not by selecting first remaining tasks, it was there but the text was still crossed. Then I used filter to select only completed tasks. This one was not on the list. Anyone having the same problem or some settings that I missed?