(See attached image of one of my projects. Note: purple is next action.)

For example, I'm setting up a conference, which is some time away, in May. As I'm writing what'll be a very long list for a very big project, you can already see two things I want to do on Monday. This isn't "in progress", this is actually what I want to do on Monday, and it's the entire list of actions until then. Well, you can see that I've designed this in such a way that the following are available on Monday:

• Continue my mind-map
• Write a draft email

As you can see, I've totally adhered to the design of project types. Well, in terms of available tasks, this list is irrefutably reporting falsely. Only one of those is showing up, not both. This is not about tidiness, preference, simplicity. I'm right, OmniFocus is wrong.

By the way, it's not even marking the top item on the parallel list as available –*it seems to be confused by the nested actions.
Attached Thumbnails
Click image for larger version

Name:	Picture 1.jpg
Views:	562
Size:	10.1 KB
ID:	862