View Single Post
If I pop open the dropdown list on a task that already has a project assignment and rather than selecting anything I click outside the list, then the folder name is dropped from that tasks's display so that only the bare project name is showing.

It seems to be only a display issue, because if I pop open the project list, the project is still shown properly with the folder name. Also, the display is corrected if I switch to the planning mode and then back to context mode.

Preconditions: The preference for displaying hierarchical names in the outline is checked. I am in context mode where there is a task with a project already assigned. v94320.

Does anyone else experience this?