View Single Post
I'm waiting for the item from Alice. It blocks the subsequent tasks in my project. If I don't want it distracting me, I put a future start date on it. When the start date roles around, if I've received the item then I check off the task and move ahead with the project. I don't want an item popping up telling me to Remind Alice about the TPS reports if, in fact, she already gave them to me. If I did it that way, then I'd have to evaluate every Remind action before doing it. As it is, I have to evaluate every Waiting For action, but those are neatly identified with this system and are captured in my tickler review.

This system works fine for me. The OP specifically asked what I'm doing. I answered. If that doesn't work for you, feel free to do something different. I won't have an argument about which approach is right.
__________________
Cheers,

Curt