View Single Post
Agree that integration with OP would be great. What would constitute "tight" integration?

I'm thinking manual mapping of projects between OF and OP. Then, once they are mapped, bidirectional sync on demand. This would be killer if OP were the master control panel; and, assuming that I have the rights, I could map a node in OP to a project in a team member's OF database.