For my purposes, this is one of the most practical and useful scripts I have seen in a long time. Thanks guys for working on it. If at some point in the future someone feels like making a tweak [actually, I hope Omni picks this script up], here is what would be cool: it would be cool to be able to pick from which day the dates are calculated from. Right now, the script bases the calculations on whatever day you run it. For example, if it was 9/1 the 5d would become 9/10. If you wanted to activate the project on 10/1 and it was 9/1, it would be great to indicate so instead of having to manually change all of the days. All that being said, it is a GREAT script and beggar's can't be choosy. I'm very happy and I hope others can find use for the script.

Steve