Quote:
Originally Posted by turadg
|
This works very well. The only caveat is that the Evernote Note containing the task needs to by synchronized BEFORE the task section is highlighted. Otherwise there is a prompt asking to synchronized before making a notes link, and the OF task does not get the link generated. I tried to force synchronization in the script, but I think a delay needs to be put in before the copying of the Note link, and I have not figured out how to do it. If a note is synched all is well.