Hi,
I am posting this since I don't see any discussion of this topic in the recent history of the forum (at least in the last couple of years).
I would like to be able to set a variable that is used to modify the duration of a single task. Alternatively, a variable that controls a loop step that allows me to repeat a single step n times. In my case, most of the schedule stays the same (set-up and break-down time is constant), but some sub-tasks scale with the number of iterations of a particular project.
Obviously, I can do this manually, but it would be great to enter a variable and have the entire process scale accordingly.
Does this feature exist? If not, is there still a plan to add it (and when will it be available?
Thanks,
Dan
I am posting this since I don't see any discussion of this topic in the recent history of the forum (at least in the last couple of years).
I would like to be able to set a variable that is used to modify the duration of a single task. Alternatively, a variable that controls a loop step that allows me to repeat a single step n times. In my case, most of the schedule stays the same (set-up and break-down time is constant), but some sub-tasks scale with the number of iterations of a particular project.
Obviously, I can do this manually, but it would be great to enter a variable and have the entire process scale accordingly.
Does this feature exist? If not, is there still a plan to add it (and when will it be available?
Thanks,
Dan