I recently started to make some serious use of OP and I must say I have a number of remarks and suggestions.

On a fairly large project printing results in a slowdown/beachball on my machine (12" PB 1.5 Ghz 1.25 Gb). The current settings for printing also resulted in an unrealistically high number of sheets (200) and reducing the time span to print takes ages (due to slow response).

Assigning multiple staff members to a task divides the time needed for this task by the number of staff. In my opinion this is in several cases not the most logical option, e.g. for meetings, travelling, training,... is there an option to disable this behaviour?

I observed a consistent crash (which doesn't result in the CrashCatcher to be launched) when trying to change the % a staff member is working on the project. Is anyone else observing this?
  Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Feature request: more flexible scheduling of resources to tasks gobbel OmniPlan General 1 2013-01-30 01:36 PM
Fixed Cost, Fixed Duration, Flexible Effort/Resources metasim OmniPlan General 2 2012-02-03 04:24 PM
Omniplan fixed end dates and flexible tasks psilas OmniPlan General 4 2010-10-28 03:08 AM
More flexible labels alper OmniGraphSketcher General 6 2010-07-19 05:42 AM
options for different levels? jefferyn OmniOutliner 3 for Mac 1 2009-01-28 03:27 PM


All times are GMT -8. The time now is 07:32 AM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.