Assign time to group instead of individual tasks Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Hi there, I am trying out the trial version, and I was wondering if there was a way to assign the times to a group as opposed to the individual tasks within the group. I find that sometimes certain groups of tasks are many smaller tasks, and there is no need to enter 10 minute intervals, etc.

I like to get quite verbose in detail at times with sub tasks, etc.

Thank you.
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
can I get a violation instead of flowing some tasks in a group to the next block of available time cconstantine OmniPlan General 2 2012-10-18 07:37 AM
Pulling status info for individual tasks when outputting via HTML export m_arts OmniPlan General 1 2010-02-05 04:33 PM
Assign a time window for contexts Pixín OmniFocus 1 for Mac 2 2010-02-04 10:44 PM
Assign a period of time to work on a task each day Ben Greenfield OmniPlan General 6 2007-02-10 06:04 AM
Total Cost blank if assign task to resource group. gregc OmniPlan General 2 2007-02-06 11:15 AM


All times are GMT -8. The time now is 12:46 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.