Graphically Representing Resource Availability Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
I'm currently using the eval version of OmniPlan to see if it can replace another product. I have a resource that is only available on Mondays. I assigned him a task that requires 2 days effort. Right now the Gantt chart shows one long bar that goes from Monday to the next Monday. I prefer to instead represent his time a one bar that goes over the first Monday, then a line to another bar over the second Monday. In other words the Gantt chart bar turns into a line stretching over Tue-Fri instead of showing one long bar.

Is this possible? I looked around but didn't easily see how to do this.
--Thanks for any assistance!
 
 




Similar Threads
Thread Thread Starter Forum Replies Last Post
Resource Availability and Scheduling Problem caj001 OmniPlan General 0 2012-07-09 05:04 PM
Planned resource reduction or availability? kickaha OmniPlan General 1 2011-08-19 03:42 PM
Representing a twisted pair lennybakster OmniGraffle General 0 2011-04-13 05:26 AM
Resource shared in two 'resource groups' t-awesome OmniPlan General 1 2010-05-11 03:51 PM
Export selected resource in Resource View upriser OmniPlan General 3 2008-03-05 05:25 AM


All times are GMT -8. The time now is 06:13 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.