I find it really hard to group tasks on the iPad. The only way I can do this with any accuracy is from within a project but most of the time I group tasks to avoid creating a small project.
In the inbox, for example, I create 3 tasks
- task 1
- task 2
- task 3
I want task 1 to be the header so I select task 2 and move it to task 1. The I do the same with task 3. Fine so far.
If I then set the header's context and project, all three disappear. If I set the tasks context and projects the the header is left behind and becomes available, the 2 tasks are seperated from the header and are both available in their contexts.
I'm confused, there must be an easier way
In the inbox, for example, I create 3 tasks
- task 1
- task 2
- task 3
I want task 1 to be the header so I select task 2 and move it to task 1. The I do the same with task 3. Fine so far.
If I then set the header's context and project, all three disappear. If I set the tasks context and projects the the header is left behind and becomes available, the 2 tasks are seperated from the header and are both available in their contexts.
I'm confused, there must be an easier way