I have a resource (material) scheduled for a short time window from 6:30 pm to 9:30 pm every day.
However, when I assign that material to tasks and level, the tasks fall at times like 10:30 am and 1 pm. Totally outside of the specified availability for the resource.
Thanks in advance for any insights re: how to fix this!