Originally Posted by curt.clifton
Let me add to the chorus that every task in a parallel project should be a next action.
Let me respectfully disagree. In my way of thinking, a sequential project has tasks that must be done in order. In a parallel project, tasks don't have that absolute dependency, but I might still decide that some of them are higher priority and drag them into a rough order.

I'd like to keep the first of those designated as the "next action" because, in a practical sense, it is, even if in a logical sense, all of the tasks are potential next actions. Otherwise, I don't see the point of filtering "next actions" vs. available actions.

OmniFocus allows both, and I'd like to preserve the distinction. That way when I filter next actions, I get the one thing that I either must do next (for sequential projects) or really ought to do next (for parallel projects).
 
 




Similar Threads
Thread Thread Starter Forum Replies Last Post
Feature Request: baseline for single tasks LostProphet OmniPlan General 0 2012-08-08 09:09 PM
Single tasks double in forecast mogwai1904 OmniFocus 1 for Mac 4 2012-07-18 01:19 PM
Is there a way to single tasks 'pop out' to view one at a time? letega OmniFocus 1 for Mac 2 2012-04-03 07:29 AM
Single tasks-OF or something else (Like 2Do)? Lightstorm OmniFocus 1 for Mac 6 2010-10-13 10:39 AM
Exporting single tasks' info like %Done etc m_arts OmniPlan Extras 1 2010-03-29 12:09 AM


All times are GMT -8. The time now is 08:23 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.