Quote:
Originally Posted by curt.clifton
Let me add to the chorus that every task in a parallel project should be a next action.
|
I'd like to keep the first of those designated as the "next action" because, in a practical sense, it is, even if in a logical sense, all of the tasks are potential next actions. Otherwise, I don't see the point of filtering "next actions" vs. available actions.
OmniFocus allows both, and I'd like to preserve the distinction. That way when I filter next actions, I get the one thing that I either must do next (for sequential projects) or really ought to do next (for parallel projects).