Fixed Cost, Fixed Duration, Flexible Effort/Resources Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
I'd like to know if it's possible to create a fixed duration task, with a fixed cost, and have OmniPlan automatically tell me how many hours of a resource are available (based on an hourly rate entered with the resource). I've assigned a Task Cost to the task, but the Resource Cost and Total Cost fields appear to be derived/read-only. At a minimum I'd like to be able to show a cost cap on the task and know if I've assigned too many resources/hours to it and will go over budget.

Is any of this within the capabilities of OmniPlan?

Thanks!
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
variable duration for fixed Effort heikog OmniPlan General 2 2012-10-11 09:24 AM
Omniplan fixed end dates and flexible tasks psilas OmniPlan General 4 2010-10-28 03:08 AM
Fixed duration with varying effort Bijan Parsia OmniPlan General 5 2008-11-07 12:50 AM
Fixed cost for resources ? drogoul OmniPlan General 1 2007-02-14 04:08 PM


All times are GMT -8. The time now is 11:17 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.