It doesn't seem to be possible to change the duration of a group of tasks, and in doing so the durations of the individual tasks. Or is it? I'd like to be able to say, in effect, "every task in this group should take a month" or something along those lines.

Thanks in advance for any help,

Mike
 
You can select all these tasks and change the durations in the task inspector.
 
Quote:
Originally Posted by Lizard View Post
You can select all these tasks and change the durations in the task inspector.
Thanks for the quick response. I was hoping it could be done graphically, by dragging on the GANTT chart. Is this possible?
 
Not currently. We hope to add that soon though.
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Change my brain or change how I use omnifocus? rdbot Applying OmniFocus 22 2013-04-08 09:21 AM
Possible Bug, can someone please confirm - Effort-Duration-Change of days per day stephenrussett OmniPlan General 16 2010-08-06 08:45 PM
change effort w/o changing duration juicychus OmniPlan General 2 2007-11-27 02:40 PM
RFE: Group and sort by duration jschlyter OmniFocus 1 for Mac 0 2007-06-19 10:31 PM
Group duration? Bas-i OmniPlan General 1 2006-10-03 09:30 AM


All times are GMT -8. The time now is 07:54 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.