Does OmniPlan have the ability to plan events and processes without connecting them to specific dates?

A number of projects require us to plan a process in the abstract. A manufacturing assembly line, for instance, requires a complex cycle of carefully timed operations with durations of hours, minutes, seconds or even fractions of a second; but the date and time of day are irrelevant to the process.

I'd love to be able to cut loose from the calendar and plan an event in relative, rather than absolute, time. The process should begin at 00:00:00 (hours:minutes:seconds), and include tasks of fixed duration (00:03:10), and yield a total time for the complete chain of events (05:23:17).

Is it possible to do this without linking each task to a specific date or time of day?
 
 




Similar Threads
Thread Thread Starter Forum Replies Last Post
Month-Based Planning with Undetermined Start Date: Formatting and Effort Calculation DavidS OmniPlan General 0 2011-01-02 07:35 AM
Planning back from an end date hdprice OmniPlan General 2 2010-08-24 07:56 AM
Independent Columns? designdog OmniOutliner 3 for Mac 2 2008-10-07 01:29 AM
request: in planning mode: sort actions by due date/... spookyt OmniFocus 1 for Mac 1 2008-01-10 08:21 AM


All times are GMT -8. The time now is 08:41 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.