Exporting Dates to OmniPlan (or Merlin) Thread Tools Search this Thread Display Modes
OK, I just figured it out: I just need to make each column a date column.

However, now I have to tackle the next step: exporting kGTD projects. Opening the entire file results in the same problem - all dates for the tasks don't take and are reset to today's date (even though the Outliner columns are date columns).

Any ideas would be terrific. Thanks!

My original problem:

Hello,

I've been trying for an hour to import a list of tasks and dates I created in Outliner Pro into a new project in OmniPlan (and Merlin and Process). For some reason, none of the programs "take" the dates. Each task is instead assigned a date of 9/18/06 (today's date). This is the same for both programs so I'm almost certain it has something to do with Outliner.

A little more detail:

1) I create the project tasks in Outliner using simple columns: (Topic, Start, End).
2) I saved and/or exported the file as Outliner3, Outliner2, OPML.
3) I re-open or import the Outliner document. All the tasks appear, including notes, but the start and end dates are set to today's date rather than what I indicated in Outliner.


This is driving me nuts. Any ideas?

BTW - I'm trying to pick the "perfect" project software that would feed off the kGTD system I'm using in Outliner and remain in sync with iCal. Any thoughts on that would be most welcomed too.

THANKS!

Last edited by Nedzb; 2006-09-18 at 07:13 PM.. Reason: Problem partially solved
 
I have the same problem. Hope someone can give us an awnser
 
You're having trouble importing to OmniPlan? You need to import the OO file into OmniPlan using the Open command and then map the correct date columns to the start/end times. If this doesn't help, more details on what you're doing would be great.
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Exporting to Merlin 2 FROM Omnifocus RobTrew OmniFocus Extras 2 2013-03-12 11:37 PM
Exporting from OmniFocus to OmniPlan RobTrew OmniFocus Extras 11 2011-12-29 10:18 AM
Merlin 2.5 vs OmniPlan 1.5 beta wpitman OmniPlan General 2 2008-03-05 05:41 PM
Exception when exporting project in Omniplan 1.1.1 rc1 and 1.1. adhamh OmniPlan General 3 2007-06-15 11:20 AM
OmniPlan 1.0 vs Merlin 2 s.a.cooke OmniPlan General 10 2007-04-11 10:09 AM


All times are GMT -8. The time now is 12:20 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.