Hi Folks,
I put in a question to OG tech support, but I figured I'll try you all too..


Here's the problem: I have two Resources (Person 1 and Person 2). Person 1 works from 10:00AM to 2:00PM. Person 2 works from 2:05PM to 6:00PM. These schedules are reflected in the OP Calendar View. Each person has tasks assigned to them, and there are blocked times assigned to entire Project through iCal calendar subscriptions.

When I export the project to iCal, using the "Event->One per Work Period" option, I get events for Person 1 that are listed in Person 2's time slot, and events for Person 2 that are listed in Person 1's time slot.

Am I doing something wrong, or is this an export bug?

Thanks,
zsteir
 
 




Similar Threads
Thread Thread Starter Forum Replies Last Post
Script: Export (from an 'iCal' context) to iCal RobTrew OmniFocus Extras 0 2012-04-10 07:21 AM
How to export total # resources per month to CSV format hchin OmniPlan Extras 0 2011-01-13 11:00 AM
Resources in different time zones / schedules rcusick OmniPlan General 7 2009-11-17 04:19 PM
export to ical? steve OmniOutliner 3 for Mac 1 2008-07-17 10:33 AM
iCal export: export to completion date? jashmenn OmniPlan General 1 2007-02-23 12:41 PM


All times are GMT -8. The time now is 08:34 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.