The Omni Group
These forums are now read-only. Please visit our new forums to participate in discussion. A new account will be required to post in the new forums. For more info on the switch, see this post. Thank you!

Go Back   The Omni Group Forums > OmniPlan > OmniPlan General
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
Exceptions and Overtime??? Thread Tools Search this Thread Display Modes
Hi all,

I'm evaluating OmniPlan (1.5 beta), and am trying to figure out if there's a way to calculate overtime for employees. I saw that there is a way to do "exceptions" on the calendar, but I couldn't figure it out.

And I couldn't see how it applied to overtime.

Can anyone shed some light on this?

Ideally, I'd like to be able to set up my employees to get time and a half for a sixth day, and double time for a seventh day.

Regards,

hoju
 
Each resource can only have 1 cost/hour. So you'd have to set up extra resources at the new billing rates "Joe -- time and a half" and "Joe -- double time" and set their schedules to only be one day each. Then you'd have to coordinate scheduling tasks between the 3 different Joes. You could probably make it work, but OmniPlan doesn't really have proper support for this.
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Calendar Exceptions - how to use? badmanj OmniPlan for iPad 2 2012-07-27 12:57 PM
A lot of exceptions being thrown in my logs krunk OmniFocus 1 for Mac 1 2010-02-27 03:02 PM
Remove Schedule Exceptions lsamberg OmniPlan General 3 2009-10-30 01:57 AM
Assertion exceptions tslarkin Omni Frameworks 1 2009-03-23 07:18 AM


All times are GMT -8. The time now is 03:36 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.