Hi,
I am posting this since I don't see any discussion of this topic in the recent history of the forum (at least in the last couple of years).

I would like to be able to set a variable that is used to modify the duration of a single task. Alternatively, a variable that controls a loop step that allows me to repeat a single step n times. In my case, most of the schedule stays the same (set-up and break-down time is constant), but some sub-tasks scale with the number of iterations of a particular project.

Obviously, I can do this manually, but it would be great to enter a variable and have the entire process scale accordingly.

Does this feature exist? If not, is there still a plan to add it (and when will it be available?

Thanks,
Dan
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
build 52.0.95239 loops on PB G4/10.5.1 andre5151 OmniFocus 1 for Mac 2 2007-11-28 05:53 PM
Recurrent tasks and iterations nobby OmniPlan General 12 2007-03-08 02:02 PM


All times are GMT -8. The time now is 02:44 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.