The Omni Group
These forums are now read-only. Please visit our new forums to participate in discussion. A new account will be required to post in the new forums. For more info on the switch, see this post. Thank you!

Go Back   The Omni Group Forums > OmniGraffle > OmniGraffle Extras
FAQ Members List Calendar Today's Posts

 
Swimlane diagrams? Thread Tools Search this Thread Display Modes
Hi,

I'm trying to create a rather complex swimlane process diagram. I didn't find a ready template or any "wizard" as in MS Visio.

It's relatively easy to create a simple swimlane diagram by first creating lanes and then dragging the process elements on top of them. However, the lanes created by this manner don't automatically resize when the elements within them grow or shrink (f.ex. process forks to two parallel tasks within the same lane). Also reorganizing them is a pain in the butt, as I can't just drag and drop the whole lane, but I have to select the lane and all of its elements before moving it.

Any pointers or hints? Or will this be on the "next release"? :)
 
That would be a great feature. (that and the automatic numbering of
flowchart symbols so that you can refer to them in a separate document).
I just made several pages and resizing the lines and numbering the elements
was a real pain.
 
OmniPlan uses a swim lane diagram for its resource view. You can drag tasks from one swim lane to another to change assigned resources.
 
Quote:
Originally Posted by Ken Case View Post
OmniPlan uses a swim lane diagram for its resource view. You can drag tasks from one swim lane to another to change assigned resources.
Thanks for your suggestion about OmniPlan (which I have) but this is not really what we want. (Or at least I). We want to be able to produce a swimlane diagram that is not specifically based on a specific date in time, but rather a non-specific amount of time and not linked to an actual date.

I want it more for the resource and process flows, not the timelines.

Can this be done with OmniPlan?
 
Hi new user here. I thought I saw a swim lane tool or template but now I can't find it. Thanks so much.
 
I was looking for Swim Lane tools/templates yesterday myself. I didn't find anything, but if you have the Pro Version, you can convert from Visio. Google "Visio Swim Lane" for a starting point.
 
Quote:
Originally Posted by skippingrock View Post
Thanks for your suggestion about OmniPlan (which I have) but this is not really what we want. (Or at least I). We want to be able to produce a swimlane diagram that is not specifically based on a specific date in time, but rather a non-specific amount of time and not linked to an actual date.

I want it more for the resource and process flows, not the timelines.

Can this be done with OmniPlan?
Plus 1 to this thread...swimlanes are a must for anyone who's designing systems integration...
 
Quote:
Originally Posted by skippingrock View Post
I want it more for the resource and process flows, not the timelines.

Can this be done with OmniPlan?
OmniPlan doesn't require events to be tied to particular calendar dates. You can set your project timeline to be "Undetermined" in the Information tab of the Project inspector. This lets you know that Task B starts a week after Task A, but there are no actual dates tied to either.

Hope this helps!
 
Where are the Swim Lanes Omni? They are not in the standard Stencil packs. I didn't find them in the extras or on your Omnitopia page.

Swim Lanes are key for any Management Consultant. It looks like your product is more geared towards designers and programmers, which is a huge disappointment.

From what I can see, Swim Lanes are a feature a lot of people have been asking about.
 
 




Similar Threads
Thread Thread Starter Forum Replies Last Post
How to create a swimlane diagram that is not linked to specific dates? skippingrock OmniPlan General 0 2011-04-01 12:29 PM
ORM Diagrams? Joost OmniGraffle General 2 2010-10-03 11:22 PM
Programmatic Diagrams MtnViewMark OmniGraffle General 0 2009-03-09 11:18 AM
Venn diagrams pstout OmniGraffle General 0 2007-02-01 04:53 AM
non-hierarchical Diagrams Rolf_schmolling OmniGraffle General 1 2006-08-10 09:24 AM


All times are GMT -8. The time now is 04:43 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.