I have exactly the same problem as this one, which is the inability to adjust for tasks that are completed ahead of schedule, meaning if i have three tasks:
A, B, C , and im doing task A right now:
A
....B
........C
but if B is done ahead of schedule, when leveling, it ought to look like this :
A
....B
....C
instead of not changing at all
looks to me like its not differentiating between completed tasks and uncompleted ones, Thanks in Advance.
A, B, C , and im doing task A right now:
A
....B
........C
but if B is done ahead of schedule, when leveling, it ought to look like this :
A
....B
....C
instead of not changing at all
looks to me like its not differentiating between completed tasks and uncompleted ones, Thanks in Advance.
Last edited by mr_projects; 2007-10-30 at 11:25 AM..