Effort adjustor Thread Tools Search this Thread Display Modes
I can't seem to be able to adjust the effort or even scale up a tasks completion by simply the click and drag method. It seems to be a luck of the draw pursuit for me with it being able to happen here and there but not often. I was wondering if anyone would be able to tell me why they think this is and possible how to correct it.

By the way I am aware of the little lock you can enable by holding down command or whatever and both of them are off when I try this :S

Thanks in advance
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Zero effort task charlax OmniPlan General 2 2012-03-02 04:01 PM
Sum up effort for a resource trinix OmniPlan General 2 2012-01-30 10:39 AM
Spread effort based on duration and total effort Hap OmniPlan General 1 2007-02-14 04:50 PM
effort/duration toddbg OmniPlan General 1 2006-09-05 11:05 AM


All times are GMT -8. The time now is 10:53 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.