The Omni Group
These forums are now read-only. Please visit our new forums to participate in discussion. A new account will be required to post in the new forums. For more info on the switch, see this post. Thank you!

Go Back   The Omni Group Forums > OmniPlan > OmniPlan General
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
Linked Projects/Performance Tuning Thread Tools Search this Thread Display Modes
There are two parts to this request.
  1. As a project grows in size (the file I am working with now has 1304 lines it the contents.xml file). The overall performance of the application drops significantly. As I type in the task or comment field, the utilization of the appliation can go to 74% of the CPU (Running on a 2.0Ghz Imac with 2GB memory - not much else going on on the system at this time). The responsiveness is so slow that is a bit of a bother
  1. Linked Projects - I may have sent an email about this, but here is a fuller explanation. I sometimes have several sub-projects and my management does not want all the detail (yes I know one can collapse portions). What I would like is to be able to link all or a portion of several different tasks into another summary project. Obviously there will need to be an update/refresh function -- most of the time it will be automatic on file open.
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Slow performance? [A: We'll optimize performance later in the test program.] Xabier OmniFocus 2 for Mac (Private Test) 6 2013-04-12 05:46 AM
fine-tuning new context Perspective, to sort alphabetically na03 OmniFocus 1 for Mac 4 2009-09-05 04:11 PM
Update linked images hepaminondas OmniGraffle General 3 2009-06-10 05:53 PM
linked actions? jintrone OmniFocus 1 for Mac 2 2008-08-16 06:37 AM


All times are GMT -8. The time now is 01:28 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.