I've seen how we can obtain (i.e and subsequently iterate over) the selected projects/tasks using "selected trees or "every selected tree", when that selection is in the main content window.
But I'm having a heck of a time figuring out how to do the same for the selection(s) in the project list on the left. I was to perform operations on (and within) those using Applescript.
Any hints? Thanks in advance.
But I'm having a heck of a time figuring out how to do the same for the selection(s) in the project list on the left. I was to perform operations on (and within) those using Applescript.
Any hints? Thanks in advance.