The Omni Group
These forums are now read-only. Please visit our new forums to participate in discussion. A new account will be required to post in the new forums. For more info on the switch, see this post. Thank you!

Go Back   The Omni Group Forums > OmniPlan > OmniPlan General
FAQ Members List Calendar Today's Posts

 
Difficulty Splitting Tasks During Leveling Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
I recently bought Omniplan to help me get ready with the multiple field projects that I will be working on this summer and I am loving it so far.

One thing I am getting stuck on though is in splitting my tasks during the leveling process. I have two tasks that are repeating throughout the summer (weekly). One of them (Task 1) needs to be done as soon as the data has been prepared (set the priority to 1) and the other (Task 2) can be done in the remaining time. However when I level the resources (both tasks are set to one person) Task 2 does not split the time around Task 1, but instead looks for gaps in time where the entire task might be able to be completed. This ends up leaving lots of gaps in that person's schedule and then I end up with a lot of Task 2 at the end of the summer.

I made sure that Task 2 is set to "Splitting" and I checked the time constraints for the tasks with nothing really interfering. I even tried a simple plan in a new document and the same thing occurred. What might I be doing wrong with the splitting?

Also, unrelated, could you please add a vote for me to incorporate repeating tasks functionality.

Thanks for any help you may be able to offer!
 
 




Similar Threads
Thread Thread Starter Forum Replies Last Post
Tasks are not changing as expected with leveling nathanmeffert OmniPlan General 1 2013-04-18 02:24 PM
Backdating completed tasks (esp. after rescheduling/leveling) omnibob OmniPlan General 1 2013-02-08 08:34 PM
Leveling ignores completed tasks jelliot OmniPlan General 6 2011-09-08 02:51 PM
Issues with leveling constrained tasks bjamison@exacttarget.com OmniPlan General 1 2007-11-09 04:30 PM
Leveling of short duration tasks bgeipel OmniPlan General 3 2007-11-09 08:58 AM


All times are GMT -8. The time now is 12:34 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.