How to use hammock task for client feedback? Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Hi,

At some stage within a project, we need to wait for client feedback. I believe you need to create a hammock task for this.

However, during (re)scheduling this hammock task can get a duration of zero hours. Which means no time for feedback at all. Since it's a hammock task, I can't enter any duration.

I would like to create a hammock task with let's say a minimum duration of 1 day.

Is this possible? Or should I use another method?

Last edited by jefvdv; 2013-04-12 at 04:51 AM..
 
 




Similar Threads
Thread Thread Starter Forum Replies Last Post
Task turned Hammock; its effort reduced omnibob OmniPlan General 1 2012-08-14 07:58 AM
Hammock Tasks ChristopherRose OmniPlan General 5 2011-10-04 10:28 AM
Sharing my task list with my client Ward OmniFocus 1 for Mac 3 2007-09-12 03:45 PM


All times are GMT -8. The time now is 02:21 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.