Decouple task list order from completion order? Thread Tools Search this Thread Display Modes
I've got a bunch of tasks (call them group A) and each one is a prerequisite to one or more of a set of other tasks (group B). My task list looks like this:
  1. Group A
  2. Group B

Group A are 3D modelling tasks, and B are programming tasks. They are assigned to 3D modellers and programmers, respectively.

After assigning resources and levelling, I get a plan that takes a very long time because OmniPlan insists on scheduling all of the tasks in A before any of the tasks in B. This results in a much longer schedule than if I manually interleave groups A and B.

Is there some way to get OmniPlan to optimize for project time rather than doing everything in the listed order? All tasks have the same priority right now.
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
How do I sort or re-order the list of contexts? Joseph.Escobar OmniFocus for iPad 5 2011-10-20 04:31 PM
Task sort order gerben OmniFocus 1 for Mac 1 2009-04-28 02:40 PM
Changing of Task Order only syncs one way? santra OmniFocus Syncing 1 2008-08-06 05:08 PM


All times are GMT -8. The time now is 03:18 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.