Assign a period of time to work on a task each day Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Is there a way to assign a period of time to work on a task each day.

I'm trying to allocate resources for a project and would like to schedule some time each day to use a resource.

The idea is that if a have task that takes 5 hours and I work one 1 hour a day on the task, I could schedule the resource so that other project tasks will know the availability of the resource.

Is this possible.

Thanks,

Ben
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Forecast feature request - assign task to time slot on calendar cbeaudj OmniFocus 2 for Mac (Private Test) 3 2013-04-25 01:09 AM
Simple Applescript, Create Task, Assign resource, Assign dependency dexterama OmniPlan Extras 2 2012-11-18 12:25 PM
Way to calculate duration for a given time period? Dorian OmniFocus Syncing 1 2008-08-31 12:42 PM
Way to calculate duration for a given time period? Dorian OmniFocus 1 for Mac 0 2008-08-31 08:44 AM


All times are GMT -8. The time now is 11:00 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.